Architectural and systems redevelopment of an existing building, including the engineering and installation of a low-profile raised access floor for the new office spaces
Working within an existing industrial structure imposed strict dimensional constraints, further complicated by a high density of utility conduits and ducts that needed to be accommodated beneath the floor.


Imola Tecnica addressed these on-site challenges by implementing the compact IT 2.6 “porcelain-on-porcelain” (gres-su-gres) system, ensuring complete structural rigidity and easy access to the underlying building services.
«I worked directly with Matteo Collina, who proved to be an extremely professional and punctual point of contact. It was an impeccable collaboration; we were truly very satisfied—both in terms of meeting deadlines and regarding his constant availability to promptly provide the additional materials needed on-site for the wall and floor coverings. My assessment of the experience with Imola Tecnica is, without a doubt, entirely positive.»
— Architect Arianna Benini